ANALYSIS OF EMERGENCY SITUATIONS DURING THE CONSTRUCTION OF ROAD TUNNELS BY MINING METHODS IN THE ENGINEERING-GEOLOGICAL CONDITIONS OF THE TOWN OF SOCHI
Abstract and keywords
Abstract (English):
To generalize and classify the risks that arose during the construction of the Kurortny Prospekt bypass, a key Olympic infrastructure facility. It included 15 road tunnels with a total length of 13 km. Methods: Theoretical studies of the previously completed fieldwork, fact-finding and verification, systematisation, followed by identification of correlations, and determination of cause-and-effect relationships. Results: This analysis will provide a comprehensive overview of the risks and their causes associated with the design of tunnels excavated by mining methods along the Black Sea coast of Krasnodar region. This paper examines major emergencies stemming from the specific engineering and geological conditions present in a particular area. Practical significance: The main gaps in the regulatory documentation have been identified.

Keywords:
Road tunnel, mining method, risks, tunnel boring, tunnel design
Text
Text (PDF): Read Download
References

1. Stroyproekt. Tri desyatiletiya. 1990–2020. — URL: https://www.stpr.ru/upload/iblock/020/zcmb98m5464 7mljd1j1pbdyk7vnvu2hu/Kniga%20k%2030-letiyu.pdf (data obrascheniya: 15.06.2025).

2. Ermonin E. A. Ispol'zovanie β-metoda pri raschete tonneley, sooruzhaemyh gornym sposobom / E. A. Ermonin. — 2020. — URL: https://geoinfo.ru/product/ ermonin-evgenij-alekseevich/ispolzovanie-metoda-pri- raschete-tonnelej-sooruzhaemyh-gornym-sposobom-43544. shtml (data obrascheniya: 15.06.2025).

3. Vedomosti. — URL: https://www.vedomosti.ru/ realty/articles/2018/08/02/777065-krasnodarskom-krae- doroga-moryu (data obrascheniya: 15.06.2025).

4. FKU Uprdor «Chernomor'e». — URL: https://chnm. rosavtodor.gov.ru/department/press-center/novosti/672181 (data obrascheniya: 15.06.2025).

5. Lunardi P. Full-face excavation in difficult ground / P. Lunardi, G. Barla // Journal of Geomechanik und Tunnelbau. — 2014. — Vol. 7. — Iss. 5. — Pp. 461–468. — DOI:https://doi.org/10.1002/geot.201400037. — URL: https://www. researchgate.net/publication/266378833_Full_face_excava- tion_in_difficult_ground (data obrascheniya: 15.06.2025).

6. Kulikova E. Yu. Specifika upravleniya geotehnicheskimi riskami pri proektirovanii podzemnyh sooruzheniy / E. Yu. Kulikova, A. G. Polyankin, A. M. Potokina // Zapiski Gornogo instituta. — 2023. — T. 264. — S. 895–905.

7. Kaufman, L. L. Opyt ocenki riskov podzemnogo stroitel'stva / L. L. Kaufman, B. A. Lysikov, K. I. Zapolova, I. Zh. Sirachev // Vіsnik Dnіpropetrovs'kogo nacіonal'nogo unіversitetu zalіznichnogo transportu іm. akademіka V. Lazaryana. — 2010. — № 32. — S. 55–60. — URL: https://cyberleninka.ru/article/n/opyt-otsenki-riskov- podzemnogo-stroitelstva/viewer (data obrascheniya: 15.06.2025).

8. Livejournal. — URL: https://fotoserg.livejournal. com/67057.html (data obrascheniya: 15.06.2025).

9. Proprenter M. Risk Management in Tunnelling — A Joint Approach of all Involved / M. Proprenter, G. Lenz // ITA Library. — URL: https://ic-group.org/fileadmin/ Magazin_PDFs/2018_WTC_Risk_Management_ PROPRENTER_LENZ.pdf (data obrascheniya: 15.06.2025).

Login or Create
* Forgot password?